<aside> 📌 IPSR module versioning for the management of phases is now available in the PRMS Reporting Tool! If you require any assistance, please do not hesitate to contact us at [email protected]. We’re here to help you.

</aside>

In preparation for IPSR reporting, it is important to implement the same versioning feature in the IPSR module that is available for the Results module. The implementation of the same versioning system across modules will ensure consistent operation of the PRMS Reporting Tool.

We're rolling out the IPSR module versioning system in stages. Phase 1, which we've started, allows for the creation of IPSR phases, connects them to the respective TOC phase, and introduces other essential functions.

Next year (2024), Phase 2 of IPSR module versioning will include:

Below are details on what has been developed in Phase 1:

Management of phases

In the admin area, there is a “Phase management” subsection where users can create, edit, or delete IPSR module phases. However, note that: